PHASE 01
Survey and planning
Site visit, room-by-room detailed inventory, identification of access constraints and sensitive equipment. Deliverables: contractual schedule, risk-mitigation plan, a single dedicated project manager.
DELIVERABLE — SIGNED PROJECT PLAN
PHASE 02
Preparation and protection
Standardized packing; protection of surfaces, elevators and corridors. Systematic labelling by destination room: every crate carries a number tied to the contract inventory.
DELIVERABLE — NUMBERED INVENTORY
PHASE 03
Execution outside business hours
Evening, weekend and school-break interventions. Uniformed, background-checked personnel, supervised by the project manager. Your operations continue without interruption.
COMMITMENT — ZERO BUSINESS INTERRUPTION
PHASE 04
Secure storage (if required)
Sealed containers in a controlled-access warehouse under 24/7 monitoring. Every item remains traceable by its inventory number for the full storage period, short or long term.
DELIVERABLE — STORAGE REGISTER
PHASE 05
Hand-back and end-of-contract report
Reinstallation according to the layout plan, joint inventory verification with your representative, then delivery of the end-of-contract report — the documentary record of your file.
DELIVERABLE — END-OF-CONTRACT REPORT